Managed the design and installation of additional processing units, increasing capacity by 40%. Introduced energy-efficient compressors and digital monitoring systems to reduce operating costs by 18%.
| Unit | Capacity Before | Capacity After |
|---|---|---|
| Gas Separation | 200 MMSCFD | 300 MMSCFD |
| Compression | 150 MMSCFD | 210 MMSCFD |
